ATLANTIS THE ROYAL / PROJECT BRIEF
Large glazing.
Controlled movement.
Replacing the original sliding-door arrangement with an automatic system while preserving the intended views, fixed outer panels and centre-opening operation.
Project brief & visualisation · installation completion is not represented here.

Concept visualisation · not a photograph of completed work
The challenge
The living-room opening is 11,356 mm wide and has eight panels. One panel at each end remains fixed; the six central panels must move away from the centre, three to each side. The living room faces Palm Jumeirah and has a narrow balcony.
Two sea-facing bedrooms have openings of 5,200 mm and 5,180 mm. Each has four panels: the two outer panels are fixed and the two centre panels slide outwards. The bedrooms open onto larger terraces.
The challenge is to coordinate the door system with the existing opening, threshold, track arrangement, power, controls and available access — rather than treating motorisation as a separate accessory.
Explore the opening sequence
Choose a room and move the slider. The elevation illustrates the fixed and moving panels; it does not show track depth or replace supplier shop drawings.
Schematic centre-opening sequence. Panel spacing and stacking offsets are illustrative; dimensions are taken from the supplied brief.
Our design approach
Confirm the existing conditions
Survey the openings, levels, fixing zones and available stacking depth. Reconcile the provided schedule with the selected system manufacturer's requirements before issuing fabrication information.
Coordinate the moving panels
Develop the intended panel sequence, travel and stacking arrangement. The living-room brief refers to a four-track arrangement; its feasibility and final detailing require supplier confirmation.
Integrate power and safe operation
Coordinate the drive, cable routes, local controls, safety functions and access for maintenance. Specify operating and emergency/manual provisions with the selected manufacturer.
Review the threshold as a complete interface
Coordinate the internal floor, external balcony or terrace, drainage and weathering interfaces. Review the proposed replacement and necessary access or building-management permissions before work starts.
What this means for the owner
- An opening sequence that is easy to understand before ordering.
- Early visibility of threshold, access and electrical interfaces.
- A defined basis for supplier review, shop drawings and commissioning.
What the package can include
- Opening survey and coordinated panel schedule
- Shop drawings and system interfaces, within the agreed scope
- Drive and controls coordination with the selected supplier
- Installation sequence and protection/access requirements
- Agreed operation and safety checks, snagging and handover information
What must be verified
- Final dimensions and existing structural/fixing conditions
- System capacity, panel weights and manufacturer-approved configuration
- Safe operation, power-loss arrangements and maintenance access
- Threshold/drainage detail and applicable project permissions