Quality is a sequence.
Not a final inspection.

Our quality framework connects design review, approved materials, installation checks and handover records. The inspection plan and acceptance criteria are agreed for the actual project and contracted scope.

ESTS Quality Standard describes an internal project-delivery framework. It is not an independent certification or a claim that the example inspections shown here have been performed. Project specifications, approved details, manufacturer instructions and applicable requirements govern acceptance.

Define

Agree the detail, criteria and responsibility.

Inspect

Check the relevant work before the next stage.

Record

Document findings and supporting evidence.

Close out

Resolve findings and record re-inspection.

Eight review gates.
Evidence at every interface.

Open a discipline to see what is reviewed, which records support it and what should happen before the next stage.

Design & materialsEstablish the basis before procurement.

What is reviewed

Review the agreed scope, current drawing revisions, discipline interfaces, material submissions and any samples or mock-ups identified by the project team.

Supporting records

Approved/reviewed drawings and submittals, sample references, decision/RFI register and a project-specific inspection plan.

Before the next stage

Confirm the relevant information and material selection are released for the intended work. Outstanding decisions are recorded rather than assumed.

Concealed MEP servicesInspect what will become inaccessible.

What is reviewed

Review installed routes, supports, connections and access against the coordinated information. Plan water-system tests, drainage checks and electrical inspection/testing with the responsible specialists as specified.

Supporting records

Location-tagged photographs, inspection requests, relevant test records, marked-up routes and identified findings.

Before the next stage

Resolve relevant defects and complete the specified checks before concealing the installation. Record re-inspection where a finding required correction.

Waterproofing & wet areasCheck the complete waterproofing interface.

What is reviewed

Review substrate readiness, falls where specified, corners, penetrations, drain interfaces, membrane coverage and protection. Test conditions and curing requirements follow the approved system and project specification.

Supporting records

Approved system/detail, material references, preparation and application photographs, relevant inspection and water-test records.

Before the next stage

Complete the specified inspection/test and rectify findings before covering or tiling. Do not substitute a universal test duration for the approved project requirements.

HVAC & ventilationCheck installation and intended performance.

What is reviewed

Review equipment/duct installation, insulation, access, supply and return interfaces, ventilation routes and condensate provision. Identify the required leakage tests, balancing and commissioning activities for the selected design.

Supporting records

Equipment schedule, installation inspection records, relevant test/balancing/commissioning reports and outstanding-item register.

Before the next stage

Close the relevant installation findings before ceiling closure, and complete the agreed performance checks before system handover.

Stone, tiling & finishesAgree the detail before repeating it.

What is reviewed

Review the sample/mock-up, substrate, setting-out, stone selection, visible joints, edges, interfaces and protection. Confirm product compatibility and movement details through the approved specification and supplier guidance.

Supporting records

Sample approval, material references, setting-out information, inspection photographs and recorded findings/corrections.

Before the next stage

Review the agreed benchmark and first installed area before repeating the finish. Correct defects and protect completed surfaces before following trades enter.

Glazing & automationReview the whole opening.

What is reviewed

Review the surveyed opening, fixing and sealing interfaces, alignment, threshold/drainage details and access. For motorised systems, agree operation, controls and safety checks with the selected manufacturer.

Supporting records

Supplier-approved shop details, installation checks, specified operation/safety records, maintenance and warranty information.

Before the next stage

Close installation findings and demonstrate the agreed operating functions before handover. Record any unresolved limitations rather than presenting them as accepted.

Snagging & re-inspectionClose findings with evidence.

What is reviewed

Inspect the agreed scope, record findings by location and discipline, assign responsibility and review corrections. Distinguish open, corrected and re-inspected items.

Supporting records

Snag register, dated photographs, correction notes and the relevant re-inspection/acceptance record.

Before the next stage

Confirm the agreed completion status with the project team. Carry genuine outstanding items into a documented close-out plan.

Handover & aftercareMake the installed work understandable.

What is reviewed

Review the agreed handover deliverables: as-built information, equipment identification, operating instructions, maintenance access, warranties, test records and the defects-reporting route.

Supporting records

Handover index, available as-built drawings, O&M information, warranties, commissioning records and any agreed outstanding-item list.

Before the next stage

Confirm the contracted handover package and explain operation/maintenance obligations. Warranty periods, exclusions and aftercare responsibilities remain those stated in the project documents.

ILLUSTRATIVE RECORD FORMAT

What an inspection record should make clear.

The example below shows the structure of a review record. It contains no real site results, signatures or acceptance certificate.

Concept visualisation · not a photograph of completed work

Concept visualisation · not a photograph of completed work

Work package
Wet-area waterproofing
Location / drawing revision
Assigned for the actual project
Inspection stage
Before covering the membrane
Acceptance basis
Approved detail, system instructions and project inspection plan
Required evidence
Preparation/application photographs and specified test record
Example status
Pending inspection — no pass result claimed
If a finding is raised
Assign a correction, record evidence and arrange re-inspection
Release decision
Recorded by the responsible project team after review

Agree the evidence
before the work starts.

The useful question is not simply “Will you check the quality?” It is “Which checks, against which criteria, recorded by whom, and before which stage?” We define that conversation around your project.